43 lines
1.4 KiB
Java
43 lines
1.4 KiB
Java
|
/*
|
||
|
* Copyright (C) 2010 The Android Open Source Project
|
||
|
*
|
||
|
* Licensed under the Apache License, Version 2.0 (the "License");
|
||
|
* you may not use this file except in compliance with the License.
|
||
|
* You may obtain a copy of the License at
|
||
|
*
|
||
|
* http://www.apache.org/licenses/LICENSE-2.0
|
||
|
*
|
||
|
* Unless required by applicable law or agreed to in writing, software
|
||
|
* distributed under the License is distributed on an "AS IS" BASIS,
|
||
|
* WITHOUT WARRANTIES OR CONDITIONS OF ANY KIND, either express or implied.
|
||
|
* See the License for the specific language governing permissions and
|
||
|
* limitations under the License.
|
||
|
*/
|
||
|
|
||
|
package com.android.contacts.common.util;
|
||
|
|
||
|
import android.text.format.Time;
|
||
|
|
||
|
/** Utility methods for processing dates. */
|
||
|
public class DateUtils {
|
||
|
|
||
|
/**
|
||
|
* Determine the difference, in days between two dates. Uses similar logic as the {@link
|
||
|
* android.text.format.DateUtils.getRelativeTimeSpanString} method.
|
||
|
*
|
||
|
* @param time Instance of time object to use for calculations.
|
||
|
* @param date1 First date to check.
|
||
|
* @param date2 Second date to check.
|
||
|
* @return The absolute difference in days between the two dates.
|
||
|
*/
|
||
|
public static int getDayDifference(Time time, long date1, long date2) {
|
||
|
time.set(date1);
|
||
|
int startDay = Time.getJulianDay(date1, time.gmtoff);
|
||
|
|
||
|
time.set(date2);
|
||
|
int currentDay = Time.getJulianDay(date2, time.gmtoff);
|
||
|
|
||
|
return Math.abs(currentDay - startDay);
|
||
|
}
|
||
|
}
|